Protecting People, Property and Our Way of Life

Current Projects

As of August 20, 2021

UNDER CONSTRUCTION

  • TLBB Element 2, (Lockport to Mathews Levee Improvement Project), Phase 2: Thibodaux-Lockport-Bayou Blue
  • Cyprien FDA Channel Improvements or Cyprien Discharge Levee Improvements: Thibodaux-Lockport-Bayou Blue
  • Lockport-Larose Levee Project Reach C4, C5, D1: Lockport-Larose
  • East 80 Arpent (Dixie) Canal Maintenance Dredging: Choupic
  • New Valentine/Ludevine FDA: Valentine-East
  • T-Bois Levee Improvements Hamilton St. to North American Shipyard: Valentine- East
  • Natural Gas FDA Levee Improvements: Gheens
  • Zeller Larousse Phase 2: Lake Bouef Watershed
  • Raceland Prairie Levee Seepage Repairs and Maintenance: Thibodaux-Lockport-Bayou Blue
  • Morganza to the Gulf Eastern Tie-In, Reach 2 Interim Improvements: Valentine-East

OUT TO BID

DESIGN PHASE

  • Bayou Blue – Hollywood Backwater Flood Protection Project: Thibodaux-Lockport-Bayou Blue
  • Lockport to Larose Reach B Levee Project Phase 1: Lockport-Larose
  • T-Bois Ludevine Levee Tie-In: Valentine- East
  • Morganza to the Gulf Lockport to Larose Reach 3 Interim Improvements: Valentine-East
  • Ludevine Pump Station: Valentine-East
  • Sixth Ward Backwater Flood Protection Levee Upgrades: Choupic
  • West Choupic Storm Water Prevention: Choupic
  • TLBB Element 2, (Lockport to Mathews Levee Improvement Project), Phase 3: Thibodaux-Lockport-Bayou Blue

DEVELOPMENTAL PHASE

  • Waverly No. 2 Channel Project: Thibodaux-West
  • NSU Drainage Study: Thibodaux-West
  • Butch Hill and Twin Oaks Pump Station and FDA Improvements: Thibodaux-Lockport-Bayou Blue
  • Lake Bouef Watershed Backwater Flood Protection: Lake Bouef Watershed
  • Morganza to the Gulf, Reach 4: Gheens
  • Reach 5 Levee Allied Shipyard to Bayou Lafourche: Lockport-Larose
  • Morganza to the Gulf Lockport to Larose Study, Permitting, RoW: Lockport-Larose
  • Pump Station Study and GIS Portal Monitoring: Thibodaux-West