Protecting People, Property and Our Way of Life

Current Projects

As of August 12, 2019

(click categories below for descriptions of projects)

UNDER CONSTRUCTION

  • Lockport to Larose Valentine Return Levee
  • Lockport to Larose West Side, Reach C4 & C5 Levee
  • Lockport to Larose West Side, Reach D1 Levee
  • Des Allemands FDA Levee
  • TLBB EL No. 2 Coastal to Twin Oaks Phase 1
  • 40 Arpent and 80 Arpent Canal Maintenance Dredging
  • East Theriot Canal ROW Maintenance Dredging
  • Sam Foret Canal ROW Maintenance Dredging
  • Cyprien Channel Improvements
  • Jessie Dufrene Levee Improvements

OUT TO BID

  • TLBB – Element No. 2 Coastal to Twin Oaks Phase 2
  • Edna Barrios Pump Relocation and Pump Installation

DESIGN PHASE

  • Des Allemands FDA Pump Improvements
  • Valentine East, Lockport-to-Larose New Valentine – Ludevine
  • Bayou Blue – Hollywood Backwater Flood Protection
  • Hwy. 90 @Bayou Folse Levee Improvements
  • Crest Pump Station Stabilization
  • Zeller Larousse Phase 2 Levee Improvements
  • Natural Gas Levee Improvements

DEVELOPMENTAL PHASE

  • West Choupic Storm Water Protection
  • Morganza to the Gulf Lockport to Larose (Reaches 1 and 4)
  • Lockport to Larose Reach B
  • Pump Station Study