Protecting People, Property and Our Way of Life

Current Projects

 

(click categories below for descriptions of projects)

UNDER CONSTRUCTION

  • South Thibodaux Drainage Project
  • Levee Repairs Bayou Dumars at Hwy. 653
  • Parr Pump Station Installation/Equipment 
  • Lockport to Larose Reach D2
  • Lockport to Larose Valentine Return Levee
  • Zeller/Larousse Forced Drainage
  • Matthews Canal ROW Clearing & Maintenance Dredging
  • Lockport to Larose Valentine Return Structure

OUT TO BID

  • St. Charles By-Pass Backwater Flooding
  • Lockport to Larose Reach D3
  • Lockport to Larose Reach A2 and Claudet Levee Lift

DESIGN PHASE

  • Lockport to Larose West Side, Reach C4 & C5 Levee
  • Lockport to Larose West Side, Reach D1 Levee
  • Lockport to Larose West Side, Reach A1 Levee
  • Des Allemands FDA Levee
  • Des Allemands FDA Pump Improvements
  • Valentine East, Lockport-to-Larose New Valentine – Ludevine

DEVELOPMENTAL PHASE

  • TLBB EL No. 2 Coastal to Twin Oaks
  • West Choupic Storm Water Protection
  • 40 Arpent and 80 Arpent Canal Clearing
  • East Theriot Canal ROW Clearing
  • Sam Foret Canal ROW Clearing
  • Bayou Bouef School FD
  • Jessie Dufrene FDA/Home Place FDA
  • Lake Bouef Watershed Backwater
  • Des Allemands Breakwater Project
  • Morganza to the Gulf Lockport to Larose
  • Bayou Blue – Hollywood Backwater Flood Protection