UNDER CONSTRUCTION

  • TLBB Element 2, (Lockport to Mathews Levee Improvement Project), Phase 2
  • Cyprien FDA Channel Improvements or Cyprien Discharge Levee Improvements
  • Lockport-Larose Levee Project Reach C4, C5, D1
  • East 80 Arpent (Dixie) Canal Maintenance Dredging
  • New Valentine/Ludevine FDA
  • T-Bois Levee FDA

OUT TO BID

  • Natural Gas FDA Levee Improvements

DESIGN PHASE

  • Bayou Blue – Hollywood Backwater Flood Protection Project
  • Morganza to the Gulf Eastern Tie-In, Reach 2 Interim Improvements
  • Raceland Prairie Levee Seepage Repairs and Maintenance
  • Lockport to Larose Reach B Levee Project
  • Zeller/Larousse Forced Drainage Area Systems Improvements

DEVELOPMENTAL PHASE

  • Waverly No. 2 Channel Project
  • NSU Drainage Study
  • Butch Hill and Twin Oaks Pump Station and FDA Improvements
  • Lake Bouef Watershed Backwater Flood Protection
  • Morganza to the Gulf, Reach 4