Protecting People, Property and Our Way of Life
St. James Project Area
Current Projects
80 Arpent Canal East – Right of Way Clearing & Maintenance Dredging
DESCRIPTION: This project includes clearing the 80 Arpent Canal and adjacent rights of ways of debris and vegetation, along with maintenance dredging of the canal.
STATUS: The NLLD cleared trees from this Canal post Hurricane Isaac. Engineering and surveying to receive permits for this project are currently underway by the NLLD. Recently, the NLLD received $1.1M in State Capital Outlay funds for this project.
Project COA 6500.52Z
Rienzi Canal Maintenance Dredging
DESCRIPTION/STATUS: This project involves maintenance dredging and removal of the spoil for the portion of the Rienzi Canal from Highway 308 heading north approximately 2000 feet to Ashland Dr. It is expected that a portion of this work can be performed by the NLCLDD with in-house equipment.
Project COA 6500.56Z, Estimated Cost: $37,000.00
Rosedown Canal Maintenance Dredging Project
DESCRIPTION/STATUS: This project involves maintenance dredging and removal of the spoil for the portion of the Rosedown Canal approximately 330 feet east of and parallel to North Canal Blvd from Melrose Street heading north approximately 3700 feet to the Thibodaux Family Church. It is expected that a portion of this work can be performed by the NLLD with in-house equipment.
Project COA 6500.57Z, Estimated Cost: $40,000.00